Tanggal | Tempat | Kota |
---|---|---|
Belum ada jadwal terbaru |
OUTLINE MATERI
1. Diesel Engines
2. Gas Turbine Engines
3. Governor
4. Prime Movers Maintenance
5. Electrical Power Generator
6. Excitation System
7. Generator Operation
8. Insulation Testing
9. Generator Testing and Maintenance
10. Discussion and Cases Study
TRAINING METHOD
Pre test
Presentation
Discussion
Case Study
Post test
Evaluation
FACILITIES
Training Kit
Handout
Certificate
1x Lunch & 2x Coffee Break
Souvenir
Data Materi Training | |
Topik Training | : Power System Studies and Detail Designed Protection System for Power Generation |
Link | |
*Jumlah Peserta | Estimasi Jumlah Peserta yang di ajukan |
*Nama Peserta Yang Didaftarkan | |
Personal Data | |
*Nama | |
*Jabatan | Jabatan/Divisi/Departement |
*Nama Perusahaan | |
*Alamat Perusahaan | |
*Email Perusahaan | |
*Email Alternatif | eg: gmail, yahoo, hotmail |
*Telepon Kantor | |
Ekstensi | |
*Handphone | |
* Harus di isi | |