Background logo website
PT MEDIA EDUTAMA INDONESIA
Provider yang Berkarakter, Unggul dan Terpercaya
Heat Recovery Steam Generator (HRSG) Design, Operation and Maintenance Home  »  Bandung Reliability & Maintenance Technical, Mechanical & Engineering   »   Heat Recovery Steam Generator (HRSG) Design, Operation and Maintenance

Heat Recovery Steam Generator (HRSG) Design, Operation and Maintenance

March 12, 2020

Jadwal Pelatihan Heat Recovery Steam Generator (HRSG) Design, Operation and Maintenance

TanggalTempatKota
Belum ada jadwal terbaru

DESKRIPSI

Pertumbuhan di bidang industri, properti dan lain sebagainya pada dasawarsa terakhir ini berkembang sangat pesat. Hal ini berdampak pada kenaikan kebutuhan akan energi listrik. Dengan melihat perkembangan tersebut, maka tuntutan akan adanya unit-unit pembangkit sebagai pusat penghasil energi listrik terimbas untuk berkembang, baik di sisi besar kapasitas yang mampu dihasilkan maupun di sisi teknologi khususnya rekayasa permesinan, sistem operasi dan pemeliharaannya.

PLTGU adalah gabungan antara PLTG dengan PLTU, di mana panas dari gas buang dari PLTG digunakan untuk menghasilkan uap yang digunakan sebagai fluida kerja di PLTU. Dan bagian yang digunakan untuk menghasilkan uap tersebut adalah HRSG (Heat Recovery Steam Generator). Keuntungan penggunaan HRSG yang paling prinsip dibanding boiler umum (yang menggunakan burner) adalah peningkatan efisiensi karena HRSG memanfaatkan gas buang dari Turbin Gas sebagai sumber kalor sehingga tidak memerlukan bahan bakar dan udara sebagai pemanas.

Perhitungan efisiensi HRSG dilakukan dengan membandingkan laju aliran energi yang digunakan untuk menguapkan air, baik pada uap tekanan rendah maupun uap tekanan tinggi dan laju aliran energi yang terkandung dalam gas buang dari sistem PLTG yang berguna dalam HRSG.

 

PARTICIPANT

Engineers of all disciplines, managers, technicians, design, maintenance, operations personnel, and other technical individuals who need a comprehensive introduction to practical optimization, operation and design considerations of a major combined cycle power plant.

 

OUTLINE

1. Introduction and Historical Perspective

  • Comparison of Different Boilers & Cycles
  • Materials Used in Boiler Construction

2. HRSG Design Basics

  • Thermodynamics & Heat Transfer Review
  • Natural and Forced Circulation
  • Supplemental Firing
  • Basic Construction Details

3. HRSG Design Variations

  • Types of HRSG
  • Variations

4. Flow Path Descriptions

  • Waterside Flow Paths
  • Gas Side Flow Paths

5. Key Components

  • Feedwater: Preheaters, Recirculation, Deaerators
  • Economizers: Low and High Pressure
  • Evaporators & Drums
  • Relief and Safety Valves
  • Superheaters, Reheaters, Attemperators
  • Drains, Vents
  • Casing/Setting

6. Power Piping

  • Codes and Standards
  • Review of Design Criteria
  • Examples of In-Service Degradation
  • Standard Maintenance Activities
  • Engineering Analysis
  • Pipe Hanger Types and Specifications

7. Control and Instrumentation

  • Drum Level
  • Pressure and Temperature
  • Spray Systems

8. Damage & Degradation Mechanisms

  • Surface Corrosion & Pitting
  • Flow Accelerated Corrosion
  • Corrosion Fatigue
  • Cold-End Deposition & Gas Side Corrosion
  • Creep & Thermal Effects
  • Waterside Attack

9. Water & Steam Chemistry

  • Fundamentals
  • Treatment Programs
  • Steam Purity Requirements
  • Carryover

10. Operations and Maintenance

  • Operating Modes
  • Impact of Cycling
  • Standard Maintenance Activities
  • Boiler Preservation
  • Inspection Practice
  • Performance Tracking
  • Life Assessment

11. Case Histories

  • Inspections
  • Failure Analyses
  • Design Modifications
  • Performance Assessments

 

TRAINING METHOD

Presentation

Discussion

Case Study

Evaluation

 

FACILITY

Training Kit

Handout

Certificate

Lunch + 2x Coffee Break

Souvenir

Pick Up Participant (Yogyakarta)

Form Pre-Registrasi

Data Materi Training

Topik Training : Heat Recovery Steam Generator (HRSG) Design, Operation and Maintenance
Link
*Jumlah Peserta Estimasi Jumlah Peserta yang di ajukan
*Nama Peserta Yang Didaftarkan

Personal Data

*Nama
*Jabatan Jabatan/Divisi/Departement
*Nama Perusahaan
*Alamat Perusahaan
*Email Perusahaan
*Email Alternatif eg: gmail, yahoo, hotmail
*Telepon Kantor
Ekstensi
*Handphone
* Harus di isi
Tags: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
x